A.soft mud B.sand C.silt D.soft to firm clays
单项选择题It is sometimes necessary to moor bow and stern to two mooring buoys in order to().
A.avoid any swing in a restricted space B.shelter the ship from strong winds C.prevent from touching with other vessels D.make a convenience of cargo discharging
单项选择题Installing tandem anchors on the same mooring line is referred to as().
A.doubling B.pretensioning C.piggybacking D.paralleling
单项选择题In a crossing situation,a vessel fishing must keep out of the way of a vessel which is().
A.under sail B.towing C.restricted in her ability to maneuver D.engaged in pilotage duty
单项选择题In a combination chain and wire rope mooring system,the anchor chain is deployed at the anchor end of the line to().
A.increase fatigue life of the system B.reduce the time to retrieve the line C.increase the holding power D.reduce the catenary
单项选择题Galvanizing would not be suitable for protecting wire rope which is used for().
A.cargo runners B.mooring wires C.shrouds D.stays