A.under sail B.towing C.restricted in her ability to maneuver D.engaged in pilotage duty
单项选择题In a combination chain and wire rope mooring system,the anchor chain is deployed at the anchor end of the line to().
A.increase fatigue life of the system B.reduce the time to retrieve the line C.increase the holding power D.reduce the catenary
单项选择题Galvanizing would not be suitable for protecting wire rope which is used for().
A.cargo runners B.mooring wires C.shrouds D.stays
单项选择题During a storm,the chance of fatigue failure of a mooring line will increase as().
A.vessel motions increase B.mooring tensions decrease C.KG increases D.KG decreases
单项选择题Consideration should be given in planning for the mooring orientation in a new location so that in adverse weather a crane is available to off-load the supply vessel on what side of the unit?().
A.Weather side B.Leeward side C.Upwind side D.Crosswind side
单项选择题Chafing gear should be placed().
A.at all wearing points of mooring lines B.at the bitter ends of all standing rigging C.around running rigging D.on wire rope only