找考题网-背景图
单项选择题

In a combination chain and wire rope mooring system,the anchor chain is deployed at the anchor end of the line to().

A.increase fatigue life of the system
B.reduce the time to retrieve the line
C.increase the holding power
D.reduce the catenary