A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration:
(1)two Brocade 20-Port SAN Switch Modules
(2)two Nortel Networks 1/10 GB Uplink ESM
(3)a redundant AMM
What is the minimum number of power supplies needed for this configuration to have full redundancy?()