A.light B.bulk C.dangerous D.wet
单项选择题Cargo for ()No.4 is to be loaded first.
A.room B.cabin C.hold D.winch
单项选择题Bolts, nuts, split pins, hinges, wheels and stoppers should be frequently ().
A.checked B.closed C.removed D.cleared
单项选择题Before opening and closing the hatches, the spaces around the covers, all the parts and the gears should be ().
A.cleared B.checked C.removed D.repaired
单项选择题The foreman said three ()would come on board to load cargo.
A.teams B.parties C.gangs D.pairs
单项选择题The wire ropes and blocks, or pulleys, on a ship are called ().
A.fittings B.riggings C.equipment D.device