多项选择题It has become necessary to configure an existing serial interface to accept a second Frame Relay virtual circuit.Which of the following processes are required to accomplish this task?()
A.configure static frame relay map entries for each subinterface network.
B.remove the ip address from the physical interface
C.create the virtual interfaces with the interface command
D.configure each subinterface with its own IP address
E.disable splithorizon to prevent routing loops between the subinterface networks
F.encapsulate the physical interface with multipoint PPP