单项选择题
A.Use alt_disk_install B.Backup image to NIM server C.Backup using mksysb to DVD-RAM D.Apply the upgrade and do not commit
A.Create two virtual adapters on the client, each one from a separate Virtual IO Server B.Enable dead gateway detection on the client so that the network traffic can be rerouted C.Have a spare network card on standby in the client in case the Virtual IO Server goes down D.Create an etherchannel adapter on the client using one Virtual Ethernet adapter from two separate Virtual IO Servers
A.A shared pool with four capped LPARs B.A shared pool with four uncapped LPARs C.Four dedicated LPARs and use DLPAR to manage resources effectively D.The server in SMP mode and use WLM to manage resources effectively
A.The routes on the HMC B.The firewall setting of the LAN adapter C.The name resolution protocol on the p5 590 server D.The subnet mask settings on the Ethernet adapters
A.Include a new HMC in the order to connect to the p5 595 B.Include a pair of new HMCs in the order to connect to the p5 595 C.Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilities D.Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities
A.Use any Windows 2000 to graphically access the HMC B.Load, install, and configure WebSM on the workstation C.Telnet to the HMC using Exceed or a GUI emulator product from the workstation D.Load, install, and configure OpenSSH or SSH on the workstation and access the HMC through the GUI interface
微信扫一扫,免费拍照搜题
微信扫一扫,免费拍照搜题