A.vessel motions increase B.mooring tensions decrease C.KG increases D.KG decreases
单项选择题Consideration should be given in planning for the mooring orientation in a new location so that in adverse weather a crane is available to off-load the supply vessel on what side of the unit?().
A.Weather side B.Leeward side C.Upwind side D.Crosswind side
单项选择题Chafing gear should be placed().
A.at all wearing points of mooring lines B.at the bitter ends of all standing rigging C.around running rigging D.on wire rope only
单项选择题By paying out more anchor cable,you().
A.decrease the holding power of your anchor B.decrease the swing of your vessel while at anchor C.increase the holding power of your anchor D.increase the possibility that your vessel will drag anchor
单项选择题Before letting the anchor go,you should check that the().
A.chain is clear B.anchor is clear of obstructions C.wildcat is disengaged D.All of the above
单项选择题Anchoring and fishing in this area are().
A.danger B.dangerous C.dangerously D.dangering