A. reptr B. writer C. netman D. monman E. batchman F. appservman
多项选择题UsingtheTivoliDynamicWorkloadConsole,whataretwowaystochangethepriorityofajob?()
A. Open the "Set Priority" panel from the job properties. B. Change the priority of the job stream that contains the job. C. Select the corresponding action from the Monitor jobs task panel. D. Open the job stream properties and drill down to the job priority panel. E. The priority of a job can only be changed from the Workload Designer.
单项选择题WhenusingtheTivoliDynamicWorkloadConsole,whichmonitortasksareavailabletotheuser?()
A. all those that have been created by all users B. just those created by the user in the current session C. all those created by the user and shared with user’s login group D. just those where the connection engine specifies the user’s logon
多项选择题Whataretwocircumstancesforwhichitmaybeadvisabletousethesilentuninstallationmethodinsteadofaninteractivemethod?()
A. The Administrator is unable to successfully export DISPLAY to a remote server. B. IBM Tivoli Workload Scheduler is installed on a server for which there is no console access. C. DNS is not working properly and the server cannot be accessed remotely to run the uninstallation script. D. TCP on the server on which IBM Tivoli Workload Scheduler is installed is configured for half-duplex rather than full-duplex. E. The remote IBM Tivoli Workload Scheduler server is multi-homed, thus the return connection to IBM Tivoli Workload Scheduler cannot be established thereby requiring the use of the silent uninstaller.
单项选择题User twsuser is logged on to the IBM Tivoli Workload Scheduler Master Domain Manager server using Job Scheduling Console to update calendar. The user receives a message: MODIFY on CALENDAR access not granted. What is the cause of this error?()
A. Batchman process is down. B. User password has expired. C. WebSphere security is damaged. D. There are insufficient permissions in Security file.
单项选择题An IBM Tivoli Workload Scheduler administrator finds that most of the job streams are carried forward during each production day. Which action should the administrator take to ensure that only a few job streams need to be carried forward? ()
A. change start of day B. disable the Carry Forward option C. cancel all job streams before start of day D. Administrator does not have to take any action