A.Charterer B.Consignee C.Consignor D.Carrier
单项选择题()loading has not been completed,the Charterer is entitled to delay the vessel’s sailing until the expiration of lay time.
A.As long so B.So long C.As long D.So long as
单项选择题()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
A.A carrier B.A consignee C.A consigner D.A receiver
单项选择题()cargoes chargeable at the same rate,part of one ton shall be taken as one ton.
A.At B.For C.On D.About