问答题翻译:The primary limitations for gas lift operations are the lack of formation gas of an outside source of gas, wide well spacing, and available space for compressors on off-shore plat forms. Generally, gas lift is not applicable to single-well installations and widely spaced wells that are not suited for a centrally located power system.