A.cables B.miles C.kilometers D.knot
单项选择题The construction portfolio may be included as part of the ship().
A.general plans B.operating manual C.builders documentation D.CCS file
单项选择题The circular steel structure installed around the propeller of a towboat is the().
A.nozzle B.shroud C.strut D.hood
单项选择题The bow thruster generally is ineffective at().
A.over 3 knots headway B.at any speed astern C.at any speed ahead D.over 1 knot sternway
单项选择题Structural bulkheads on a ship are usually().
A.continuous B.watertight C.transverse D.non-watertight
单项选择题Signs of racking stresses generally appear at the().
A.bow and stern shell frames and plating B.junction of the frames with the beams and floors C.garboard strake,at each side of the keel D.thrust bearing of the main shaft