A customer would like to consolidate multiple database workloads to a single server to reduce TCO. What is the effect of PowerVM on TCO?()
A.Reduces SAN cost B.Reduces network cost C.Reduces administration costs D.Reduces software licensing cost
单项选择题A customer has a requirement to eliminate single points of failure for an application. They have allocated one Ethernet adapter to each VIO server on the system. Which features of PowerVM and AIX will support the customer requirement?()
A.Etherchannel and trunking B.Network Interface Backup and Etherchannel C.Shared Ethernet Adapter (SEA) Failover and Etherchannel D.Network Interface Backup and Shared Ethernet Adapter failover
单项选择题A proposed server architecture includes SAN LUNs being presented to client LPARs using shared HBAs to reduce infrastructure cost. The customer requires minimal management efforts for the dual VIO Servers. Which technology is recommended for this proposal?()
A.NPIV B.vSCSI C.Arbitrated loop D.Converged adapter
单项选择题WhatoperatingsystemisrequiredtosupportActiveMemoryExpansion?()
A.AIX 6.1 B.AIX 5.3 C.Red Hat 10 D.SUSE LINUX 11
单项选择题AfterpurchasingtheActiveMemoryExpansion(AME)EnablementFeature,whattasksmustbecompletedbeforeAMEcanbeused?()
A.Enable using active partition properties with DLPAR B.Enter the activation key via the AIX 6.1 command line and reboot AIX C.Enter the activation key via the HMC,power cycle the managed system and start the LPAR D.Enter the activation key via the HMC,modify the partition profile and restart the LPAR
单项选择题A Power 770 customer needs to add additional I O adapters. There is no room for the cards, so an I O drawer must be added. What resource will help identify supported I O drawers and the maximum number of drawers permitted per loop?()
A.I/O Planning Guide B.Power Systems data sheet C.Power Systems Facts and Features D.Run FLRT to recommend I/O features