A.Redundant 2900W (2 x 2900 W) B.Single 2900W (1 x 2900 W) C.Single 2000W (1 x 2000 W). D.Redundant 2000W (2 x 2000 W)
单项选择题A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the internal fibre switches. Consequently. the customer wants to use the Optical Pass-Thru Module (OPM). What TRUE statement should be mentioned to the customer regarding the OPM?()
A.You can not put the Optical Pass-Thru Module in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch. B.Using blade servers with the Optical Pass-Thru Module will require more fibre ports on the external fibre switch. C.The Optical Pass-Thru Module does not provide the customer with an opportunity to reuse their fibre switch. D.The blade servers do not work with the Optical Pass-Thru Module.
单项选择题Your BladeCenter customer operates multiple geographically dispersed datacenters and needs resilient remote access to servers. What is the most cost-effective solution listed below?()
A.Add redundant management modules B.Individual 1U and 2U servers equipped with Remote Support Adapters C.Train and deploy highly skilled system administrators to each site D.Maintain system administrators centrally and dispatch to remote sites when needed
单项选择题A customer wants to realize a server-based computing scenario for trading floor applications with IBM BladeCenter. The customer expects the solution to offer high security and manageability, while delivering hardware-based graphics compression and full USB capability. Is this possible?()
A.A B.B C.C D.D
单项选择题A customer has a BladeCenter E installed and plans to migrate their current Blades to the BladeCenter H. What options will migrate from the BladeCenter E to the BladeCenter H chassis? ()
A.SAN Switch modules B.Blowers C.Power supplies D.Battery backup units
单项选择题A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information, what additional items does the customer need to purchase? ()
A.An IBM BladeCenter H chassis for the JS22 Blade servers B.A concurrent KVM daughter card C.A pair of IBM BladeCenter Power Supplies D.A second Management Module