A.inspect B.impairs C.impacts D.insects
单项选择题Fueling activities()waste liquids and vapor releases to air.
A.commence B.generate C.give D.have
单项选择题Any Works completion date quoted by the Repairer is an estimate only and the Repairer shall not be()liable for any failure to complete the Works by that date.
A.liable for any repair B.liable for any failure C.responsible for any repair D.responsible for any fulfilling
单项选择题When hoisting a boat on gravity type davits using an electric motor driven winch,the davit arms should be brought up().
A.to their final position with the winch operating at slow speed B.to the bar stop,and then hand cranked to their final position C.until just before they make contact with the limit switch,and then hand cranked to their final position D.to the embarkation deck,and then hand cranked to their final position
单项选择题When a line is spirally coiled about its end and lying flat on deck,it is said to be().
A.coiled B.faked C.flemished D.seized
单项选择题What is TRUE about hoisting operations?()
A.Personnel may work beneath suspended loads,as long as they are alert and wear hard hats B.If a suspended load with no tag begins to spin,personnel should attempt to stop the spinning if the load is within reach C.If tag lines are used to control a suspended load,they should be secured to the deck D.Personnel not involved in the hoisting operation should be kept clear of the transfer area