找考题网-背景图
判断题

topology exhibit: 
 



You work as a network engineer at . is a large international company with offices on all continents. You work at the Chicago Office. Your boss at ,Miss ,has asked you to install a Catalyst 3500 to provide for another 24 users. Your instructions are as follows: 
* install it in an IDF 
* extremely import to have the proper configuration of the Catalyst before it is placed into the product information 
* it should not participate in VTP 
* it should forward VTP advertisements that are received on trunk ports 
* all nontrunking interfaces, Fa0/1 to Fa0/24) should immediately to the forwarding state of the Spanning tree. 
* configure all Fast Ethernet ports (the user ports) such as they are nontrunking. 
* the fastEthernet interfaces 0/12 through 0/24 should be placed in VLAN 20

【参考答案】

正确
热门试题

判断题Network topology exhibit:  You work as a network administrator at . You study the network topology exhibit carefully. is a small  company that has an existing enterprise network consisting of two switches named 1 and 2. The network topology schemata indicates their layer 2 mapping. VLAN 40 is a new VLAN that will be used to provide the shipping personnel access to the server. For security reasons, it is necessary to restrict access to VLAN 20 in the following manner:  Users connecting to 1’s port must be authenticate before they are given access to the network. Authentication is to be done via a Radius server:  Radius server host: 172.120.39.46  Radius key: key  Authentication should be implemented as close to the host device possible.  Devices on VLAN 20 are restricted to in the address range of 172.120.40.0 24.  Packets from devices in the address range of 172.120.40.0 24 should be passed on VLAN 20.  Packets from devices in any other address range should be dropped on VLAN 20. Filtering should be implemented as close to the server farm as possible.  The Radius server and application servers will be installed at a future date. You have been tasked with implementing the above access control as a pre-condition to installing the servers. You must use the available IOS switch features.