A、culture B、strategy C、spirit D、structure
单项选择题The life cycle of a project is a description of the various phases of the project from the beginning to the end. One of the followings is not a phase of the traditional project life cycle, It is().
A、development B、concept C、system analysis D、implementation
单项选择题()represents the information assets characterized by such a High volume, Velocity and Variety to require specific Technology and Analytical Methods for its transformation into Value.
A、Internet plus B、Industry 4.0 C、Big data D、Cloud computing
单项选择题Cloud computing is a type of Internet-based computing that provides shared computer processing resources and data to computers and other devices on demand. Advocates claim that cloud computing allows companies to avoid up-front infrastructure costs. Cloud computing now has few service form, but it is not including ().
A、IaaS B、PaaS C、SaaS D、DaaS
单项选择题项目经理在运行预算方案编制时,收集到的基础数据如下:工作包的成本估算为40万元;工作包的应急储备金为4万元;管理储备金为2万元。该项目的成本基准是()万元。
A、40 B、44 C、42 D、46
单项选择题某企业生产甲、乙两种产品,其单位利润分别是300元、200元,该公司有两个机械加工中心Ⅰ和Ⅱ,它们每天工作的有效工时分别为20小时、18小时。甲、乙产品都需经过这两个中心加工,生产每单位产品甲在加工中心Ⅰ需要1小时,在加工中心Ⅱ需要3小时。生产每单位产品乙在加工中心Ⅰ和Ⅱ各需要2小时和1小时。根据市场调查,产品甲的日需求量不会超过5单位,产品乙则无论生产多少都能售完。利润最大的生产方案是()。
A、每天生产产品甲4.2单位,乙8.6单位 B、每天生产产品甲4.6单位,乙6.8单位 C、每天生产产品甲3.6单位,乙7.5单位 D、每天生产产品甲3.2单位,乙8.4单位